Careers hero image
Our Portifolio

Committed to

operate and deliver solutions

Power Systems Works

Civil Works, Installation and Commissioning of Power Transformer, DC System and MV Cable Works at the Nakasamba Substation.

Construction of 400kV Transmission Line from Karuma – Kawanda 248kM Double Circuit AAAC(Rubus) • Construction of 132kV Transmission Line from Karuma – Lira 75KM Double Circuit (DC) AAAC(Opas)

Construction of 400kV Transmission Line from Karuma – Olwiyo 55kM Double Circuit (DC) AAAC(Rubus) • Civil Works, Installation and Commissioning of Power Transformer, RMU and MV Cable Works in the Kinyara RMU and Substation

Power Systems Works
Solar Energy Works

Solar Energy Works

Solar On-Grid Works in Bugiri, Busia, Mbarara, Iganga, and Mutungo

• Solar System Construction in regions of Iganga, Kaboole, and Namisindwa.

Off-Grid Solar Systems in Rakai, Kalangala, and Kiryandongo while enhancing access to electricity for essential services.

Solar PV Installations in Wakiso and Mpigi: Integrated solar power in community health centers to ensure reliable energy supply.

Solar Mini-Grids in Bulambuli and Kapchorwa: Constructed renewable energy grids for homes and businesses in underserved areas.

Hybrid Solar Systems in Gulu and Lira: Powered institutions with a combination of solar and backup systems, promoting sustainability and resilience.

Hydro Energy Works

Isimba Hydro Power Plant: We were part of team that worked on the development of the 183 MW plant, supporting efficient operations.

Nalubale Hydro Power Station: Assisted in maintaining the systems to sustain its role in Uganda’s power supply.

Karuma Hydro Power Project: Part of the team delivering the 600 MW project, focusing on control and instrumentation.

Owen Falls Dam: Contributed to rehabilitation efforts for the Owen Falls Dam, supporting its modernization and ensuring it continues to meet the growing energy demands in Uganda.

Solar Energy Works
Solar Energy Works

Telecom Tower Works

Telecom Tower Construction: Successfully delivered telecom towers in Katalemwa (Matugga) and Arua 2, improving connectivity in rural and underserved regions.

• Infrastructure Expansion in Ntungamo: Built the Kyanju Cell Telecom Tower to enhance network access in the southwestern region.

Telecom Projects in Eastern Uganda: Completed telecom towers in Naluwoli (Kamuli) and Nabidonga B (Iganga), expanding coverage across eastern Uganda.

Colocation Services: Installed shared telecom facilities in Buyondo and Kigimbi B, supporting efficient use of infrastructure by multiple network providers.

Telecom Network Development: Developed towers in Mutongo (Kaboole) and Namisindwa H/Q, boosting connectivity services.

Water Systems Works

Water Transmission Lines: PSI Engineering installed essential water transmission lines, ensuring efficient water distribution to local communities across various regions

Reservoir Construction: PSI Engineering developed reservoirs to store water, improving water supply and accessibility for communities in remote areas.

Pumping Station Installation: The company installed pumping stations to regulate water flow and pressure, enhancing the reliability of water supply systems

Water Infrastructure Maintenance: PSI Engineering is committed to the ongoing maintenance of water infrastructure to ensure sustained functionality and continuous service for the communities.

Solar Energy Works
Solar Energy Works

Optic Fibre Works

330km of Aerial/Overhead Stringing: Installed 330 kilometers of aerial optic fiber in Northern Uganda to enhance regional network connectivity.

aerial fiber network by 111.9 kilometers in Northern Uganda, further improving communication infrastructure.

144km of Aerial/Overhead Cable Stringing: Contributed to fiber network growth with 144 kilometers of aerial installation across Northern Uganda.

227km of Underground Maintenance: Conducted extensive underground fiber maintenance work (227 km) in Northern Uganda to ensure the reliability of the network.

• 15km of Aerial/Overhead Stringing in Central Uganda: Completed 15 kilometers of aerial optic fiber installation in Central Uganda.